EnergizeOSMicrogrid EMS
F1 — Zero Export Guard Live Sim

Reverse Flow Prevention

SDG&E interconnection requires zero net export at the PCC. This module simulates the EMS enforcement loop: real-time meter feedback → zero-export check → automatic BESS discharge clamp. Drag the sliders to explore what happens when load drops or BESS output rises.

PCC Net Flow
BESS Output
Site Load
kW total
BESS SOC
C2 Status
Zero export check
Clamp Events
0
This session

Live PCC Power Flow

Positive = site importing from utility (normal). Negative = site exporting to utility (Rule 21 violation).
Export ← 0 kW (PCC) → Import

Simulation Controls

−996 kW discharge0+996 kW charge
100 kW (low)1,580 kW (peak)

C2 — Zero Export Interlock

Rule 21 requirement: Site must not inject power to the utility grid. The EMS monitors the SEL-735 revenue meter at the PCC every 1 second. If net flow goes below −2 kW (dead band), BESS discharge is clamped within the same poll cycle.

Event Log